As discussed in the Preface, an update of the Master Plan for Athens-Ben Epps Airport was initiated in October of 1997. However, seven months into the process, work was delayed at the direction of Airport representatives while other analyses related to but outside of the master planning process were conducted. In June of 2001, work was resumed on the Master Plan project at the request of the Airport Director.

A product of the seven-month effort initiated in 1997 was the "Master Plan Update Aviation Activity Forecasts Technical Paper". This document was intended to become a section of the overall Master Plan Update report and is organized into four significant subsections: forecast assumptions, socioeconomics, historic activity, and activity forecasts. As discussed in the opening of the Technical Paper, several sources of data were reviewed during the formulation of the Master Plan Update Aviation Activity Forecasts, including: FAA Terminal Area Forecasts (TAFs) for Athens-Ben Epps Airport and the Nation; FAA National Aviation Forecasts Fiscal Years 1997-2008; the Georgia Statewide System Plan; the 1995 Athens-Ben Epps Airport Master Plan Update. The Technical Paper also considers past growth trends of various aviation demand elements together with socioeconomic factors and utilizes a variety of statistical techniques to extend forecasts by others and identified trends into the future. In order to document this comprehensive 1997 work effort, yet minimize confusion between the previously approved forecasts and the updated forecasts to be discussed below, the Master Plan Update Aviation Activity Forecasts Technical Paper has been included as Appendix I.

Since the previous forecasts were prepared in December of 1997 and approved by the FAA, the initial step in recommencing the Master Plan Update was to compare these forecasts with both the actual activity levels experienced by the Airport over the past three years and with FAA projections for 2000 through 2015. This comparison of the previous Master Plan Update forecasts with Airport statistics and projections as reported by the FAA TAF on June 21, 2001, is presented in Table 2-1. As indicated by this table, significant discrepancies were identified for enplanements and operations. Beginning in 1999 and continuing through 2015, the differential in enplanements grows increasingly more significant, as is presented in 2-1. Although the differentials in operations decrease over time, the Percent Difference column in this table reveals that these differentials are significant at times, notably so in the near-term.

Due to the trends revealed in Table 2-1, an investigation was conducted to examine the potential factors that could be contributing to the significant increase in operations (26 percent higher in 1999 than what was projected) and the coinciding decrease in enplanements. Through discussions with the Airport Director, it was determined that the regional economy, expansion of the Metropolitan Area of Atlanta and its proximity to Athens, and the presence of two charter companies on the field, have all contributed to the growth of general aviation operations. It is important to note, that the recent no growth/declining trend in air carrier, air taxi/commuter, and military operations is being offset by significant increases in general aviation activity. In addition, a drop in enplanements was experienced at the Airport since the approval of the 1997 forecasts. Although this drop was attributed to the loss of one air carrier flight, the number of overall air carrier flights has restabilized, resulting in a rebound in enplanement levels.

Following a discussion of the discrepancies presented above in which both Airport and FAA representatives were involved, it was concluded that at an update to the December 1997 forecasts would be required. However, in order to keep both the effort expended and the review/approval periods to a minimum, it was agreed that the adjusted forecasts would fall within 10 percent of the current TAF for the outer year, 2015. Table 2-2 presents these updated forecasts.

Table 2-1

FORECASTS COMPARISON

Athens-Ben Epps Airport

 

ENPLANEMENTS

TOTAL OPERATIONS

 

1997 Master Plan Approved

 

Differential

% Difference

1997 Master Plan Approved

 

Differential

% Difference

YEAR

FAA TAF1

FAA TAF1

1997

13,300

13,287

13

0%

52,718

55,207

2,489

5%

1998

13,678

14,787

1,109

8%

53,255

60,661

7,406

14%

1999

14,056

11,258

2,798

20%

53,793

67,841

14,048

26%

2000

14,434

11,258

3,176

22%

54,330

68,877

14,547

27%

2001

14,812

11,258

3,554

24%

54,868

70,062

15,194

28%

2002

15,190

11,258

3,932

26%

55,405

71,333

15,928

29%

2003

15,620

11,258

4,362

28%

57,349

72,629

15,280

27%

2004

16,050

11,258

4,792

30%

59,293

73,882

14,589

25%

2005

16,480

11,258

5,222

32%

61,238

75,157

13,919

23%

2006

16,910

11,258

5,652

33%

63,182

76,454

13,272

21%

2007

17,340

11,258

6,082

35%

65,126

77,776

12,650

19%

2008

17,868

11,258

6,610

37%

67,285

79,047

11,763

17%

2009

18,396

11,258

7,138

39%

69,443

80,264

10,821

16%

2010

18,924

11,258

7,666

41%

71,602

81,423

9,822

14%

2011

19,452

11,258

8,194

42%

73,760

82,522

8,762

12%

2012

19,980

11,258

8,722

44%

75,919

83,638

7,720

10%

2013

20,508

11,258

9,250

45%

78,077

84,768

6,691

9%

2014

21,036

11,258

9,778

46%

80,236

85,915

5,680

7%

2015

21,564

11,258

10,306

48%

82,394

87,077

4,683

6%

2016

22,092

 

 

84,553

 

 

2017

22,620

 

 

 

86,711

 

 

 

1 FAA Terminal Area Forecast as of June 21, 2001.

 

 

 

 

 

 

NOTE: Italicized numbers indicate actual data.

 

SOURCE: THE LPA GROUP INCORPORATED

 

 

 

 

 



Table 2-2

UPDATED FORECASTS

Athens-Ben Epps Airport

CATEGORY

2002

2007

2012

2022

ENPLANEMENTS

11,469

11,821

12,173

12,876

 

 

 

 

ITINERANT OPERATIONS

 

 

 

Air Carrier

45

46

47

50

Air Taxi/Commuter

2,173

2,240

2,306

2,440

General Aviation

35,119

39,548

43,976

52,832

Military

775

799

823

870

Total

38,112

42,633

47,152

56,192

 

 

 

 

LOCAL OPERATIONS

 

 

 

General Aviation

34,515

38,713

42,910

51,306

Military

452

466

480

508

Total

34,967

39,179

43,390

51,814

 

 

 

 

TOTAL OPERATIONS

73,072

81,789

90,507

107,942

 

 

 

 

INSTRUMENT OPERATIONS

14,302

15,840

17,378

20,453

 

 

 

 

BASED AIRCRAFT

124

136

148

172

SOURCE: THE LPA GROUP INCORPORATED